Traditional wet screed
Traditional method using a larger amount of water, with longer installation and drying times.
- Higher water content The higher moisture content extends the drying process.
- Higher risk of shrinkage, cracking and deformation The higher water content can contribute to shrinkage and defects during drying.
- Longer installation time The process requires more time for installation and subsequent drying.
- Potential leveling inaccuracies Manual leveling can make it more difficult to achieve a perfectly uniform surface.
- Longer drying time Depending on site conditions, it may take between 7 and 14 days before the surface can be walked on, and around 20 days for complete drying.
- Potential additional work Additional leveling work or a greater amount of adhesive may be required.